Commissioning Under Pressure: Delivering Operational Readiness in an Active Semiconductor Facility

Tuesday, August 18, 2026 1pm ET | 10am PT | 6pm BST

Commissioning a 1.3 million square foot semiconductor fab is hard. Doing it while the facility runs, with zero interruptions to live manufacturing, is another problem entirely.

Robert Lesnau from Stantec and Mike Henry from GlobalWafers America will walk through how the first U.S. based 300mm wafer fab in Sherman, TX was commissioned, greenfield to production in under two years, and how they adapted testing around active production.

Can't see the form? Some networks block HubSpot forms. Register directly via Zoom.

Key Takeaways

  • Adaptive commissioning beats rigid plans. Real-time prioritization kept work moving around live production instead of stopping it.
  • Communication is the best control system. After a near-miss, daily energization coordination meetings unified construction, operations, and Cx.
  • Technology amplifies execution. Running 6,217 assets, 3,046 checklists, and 296 FPTs kept field execution and project status connected across two contractors per trade.
  • Coordination makes zero downtime possible. Systems were tested and available to the owner before substantial completion, with no impact to live manufacturing.